• Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance
  • video

Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance

  • TONSEN
  • JINAN
  • 30 WORKING DAYS
  • 5000 SETS/YEAR
Product Description Basic specification list below 200L 2-vessels beer brewing solutions Electric heating way Electric Supply: 3 Phase 380V 50Hz or customized Mining System

Micro Qualified 200L Ale Equipment PASSED CE AND SGS with strong performance

Micro Qualified 200L

Product Description

Basic specification list below

200L 2-vessels beer brewing solutions

Electric heating way

Electric Supply: 3 Phase 380V 50Hz or customized

Mining System

 

Equipment

Malt mill  

Capacity: 80-100kg/h

(*Carbon steel or stainless steel for customized*)

Malt mining system is the fist process for beer brewing, and rashed malt was transported to mash tun, and wait for be brewed. You can choose one follow your actual demands. We sugget you choose caarbon steel type because it is economy and practical, and the printed surface appearance look nice. Stainless steel type is more expensive.

Brew House System

Cooling System

Micro Qualified 200L

 

ItemIndexQty
Mash tun200L1
Lauter tun200L1
Wort pump3T/H1
Plate heat exchanger3m21
Work platform SUS304, Matching1
Other spare partsAccessories, valves, pipesSome

Above is the specification list of brewhouse system. It is a 2 vessels of configuration . The capacity is 200L of these 2 main tanks. Electric heating way is  much better than steam, because there is no need to add a hot water tank so it can save cost and working space. Malt was mashed, lautered, boiled and whirlpoored in this system. If you want to save time to raise the water temperature in tanks, you could choose steam heating way and add a hot water tank.Pre-heaing the water by steam generator could make steam quick ,so it can save more time in brewhouse system.

Fermenting System
Equipment
Cooling System

Item

IndexQty
Fermentation tank200L6
Yeast adding tank2L1
Sanitation hoseΦ32mm, L=8m/pcs2
Other spare partsAccessories, valves, pipessome

Fermentation system is the third process in brewing, usually we advised customer buy 6 fermentation tanks. The finished malt go into fermention tanks through a heating exchanger, the temperature down low to stablity. Usually we brew one batch beer need 6-8 hours, and the period of fermentation is 10-12 days. 6 fermentation tanks are a cost effective solution. Our sanitation hose is in national standard producing, the customer never need to worry about the quaility. And the capacity of yeast adding tank is 1/10 times for fermentation tank.

Cooling System

Micro Qualified 200L

 

ItemIndexQty
Chiller machine4HP1
Ice water Tank500L1
Ice water pump3T/H1
Other spare partsAccessories, valves, pipessome

We provide a 500L glycol tank and 4HP chiller machine, and connect with pump. Usually the glycol tank is 3 times closed to fermentiation tank, and 200L capacity was fit to 500L glycal tank.

 

CIP System

 Equipment

 

ItemIndexQty
Sterilizing/alkali liquor tank50L2
CIP trolleyAs required1
Wash pump3T/H1
Other spare partsAccessories, valves, pipessome

 CIP system is a moving type, you can operate it easily.

 Control System

 Cooling SystemMicro Qualified 200L

 

Control Cabinet

  • PLC Temperature and Pressure Digital display control

  • Siemens touch screen

Warning: Usually we suggest you choose electric in 3PH of industrial range. It's better for the whole brewing line. But if you can't get to 3PH, we could customize for you but it's more expensive than 3PH. Because it's a complicate work to design electric from 3PH to 1PH. Without any other reason, please don't choose 1PH.

Packaging & Shipping

1)All tanks will be packed with soft protection material and mounted on steel frame 
2)All accessories and spare parts will be packed with soft protection material and then put into iron box 
3)After loaded into containers, all equipment will be fixed to the containers.

 

Company Information

Jinan Tonsen Equipment Co., Ltd. is an international comprehensive enterprise specializing in R&D,production,technical support and services for beer equipment and wine equipment .Our company has 80 front-line production employees,10 production management staff,5 top Professional and Technical Personnel,the product includes large,medium and small brewery equipment,hotel/bars brewed beer equipment,teaching laboratory equipment,various types of wine equipment,and provide beer equipment accessories, auxiliary equipment,control equipment,supply the main and auxiliary materials of beer brewing,brewing technique training and other services.According to customers' different requirement,our engineers can design,produce and install special specifications of equipment and other products.Our company adhering to the principles of reputation foremost ,quality first,and focus on customers,to integrate wine culture and enterprise culture,we committed to creating a world leading brands Tonsen beer processing equipment.

Equipment

FAQ

 

1.Q: It's the first year(1st year) for you to produce brewing equipments?

  A: No. We worked in this business for many years but it's the 1st year to generalize by alibaba

 

2.Q:How any years does your warranty ?

  A:The main equipment for 3 years, auxiliary ones for 1 year. 

 

3.Q;What's your advantage ?

  A:We are pioneer and know this business. Our 3 top-level technicists worked in this business over 10 years, 2 senior engineers worked over 8 years, workers average production experience is 3 years.

 

4.Q: Can you do OEM or ODM?

  A: Yes, we can do.

 

5.Q: How to control temperature ?

  A:PLC or digital display meter can control the temperature via connecting with the PT100   sensor.

 

6.Q: Is possible to supply installation in our country ?

   A: Yes, we could supply engineer to supply installation guidance and training.

 

7.Q: Can your factory produce equipment according to our drawing or samples?

   A: Yes, we can do.

Our Services

Pre-Sales Service

* Help the clients to confirm the configuration list
* Supplying different beer craft specification
* Designing the drawing according to the client’s floor plan and your requirement
* Showing the detailed diagram of the tanks

After-Sales Service

* We provide turnkey system, onsite installation service for brewery projects.
* Online technology consult.
* Life time guarantee.
* Engineers available to service machinery overseas.

 

 

Annex

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)